Final | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | CANC |
Eric Strole
|
|
|
Juan Phone #: ###-####
|
Final | 2/14/2014 | 2/14/2014 | 2/14/2014 | A | PASS |
Bill VanDegrift
|
|
|
|
Final | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | CANC |
Eric Strole
|
|
|
Juan Garcia Phone #: ###-####
|
Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PART |
Eric Strole
|
|
|
3rd floor final only - Juan Phone #: ###-####-Need airgaps on T&P drains, need to make room for T&P drains and need to caulk all tub spouts.
|
Final | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PART |
Eric Strole
|
|
|
1st and 2nd floor only fixtures // Juan Phone #: ###-####
|
Plumbing Rough-in | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Eric Strole
|
|
|
JUAN Phone #: ###-####
|
Plumbing Rough-in | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PART |
Eric Strole
|
|
|
Juan Phone #: ###-####-ground level units pass.
|
Plumbing Rough-in | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | PART |
Eric Strole
|
|
|
juan Phone #: ###-####-2nd and 3rd flr rough-in pass
|
Plumbing Rough-in | 10/11/2013 | 10/14/2013 | 10/14/2013 | P | NR |
Eric Strole
|
|
|
|
Plumbing Rough-in | 10/10/2013 | 10/10/2013 | 10/11/2013 | A | PART |
Eric Strole
|
|
|
2nd and 3rd flr on north side pass.
|
Plumbing Rough-in | 10/8/2013 | 10/9/2013 | 10/10/2013 | A | FAIL |
Eric Strole
|
|
|
Need to fix all level and backgraded dwv. Need to fix all leaks. Need to vent all fixtures per the 2009 ISPC and need to test all dwv to be inspected.
|
Plumbing Rough-in | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | NR |
Eric Strole
|
|
|
Adres Phone #: ###-####
|
Plumbing Rough-in | 10/1/2013 | 10/2/2013 | 10/2/2013 | A | DONE |
Eric Strole
|
|
|
Juan Phone #: ###-####-conferance on dwv.
|
Other | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | DONE |
Eric Strole
|
|
|
walk through with plumber-This was a walk-thru with the plumber over dwv.
|
Plumbing Rough-in | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | NR |
Bill VanDegrift
|
|
|
juan - partial Phone #: ###-#### eric needs to walk this job with plumber
|
PLM-Aging Inspection | 8/27/2013 | 8/27/2013 | 8/27/2013 | | PART |
Eric Strole
|
|
|
wip
|
Other | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | DONE |
Eric Strole
|
|
|
This was a conferance with the GC to go over the plans.
|
Groundwork | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | PASS |
Eric Strole
|
|
|
Juan-Please call at least 30 mins prior to inspection Phone #: ###-####
|