Final | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Jim Johnson
|
|
|
please call when in route ###-#### Phone #: ###-#### >> Inspection requested via web by steven smith
|
Final | 6/4/2013 | 6/4/2013 | 6/5/2013 | P | CANC |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steven smith
|
Final | 6/4/2013 | 6/5/2013 | 6/5/2013 | A | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steven smith need all water supplied equipment installed on site for final may require additional backflow to equipment need to move rp to ice machines to an accessible location need expansion tank on water heater need seal three compartment sink to wall need to remove fernco coupling,s on three compartment sink drain line and replace with shielded couplings need sign off card on site for final contractor to recall when ready
|
Plumbing Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Jim Johnson
|
|
|
Please call before arrival Phone #: ###-#### >> Inspection requested via web by steven smith
|