PLM-Aging Inspection | 5/8/2017 | 5/8/2017 | 5/8/2017 | | PEND |
Bill VanDegrift
|
|
|
expire permit
|
DOC - Permit Expired | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Bill VanDegrift
|
|
|
expire permit
|
PLM-Aging Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 11/7/2016 | 11/7/2016 | 11/7/2016 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 | | PEND |
Eric Strole
|
|
|
no calls
|
PLM-Aging Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 | | PART |
Eric Strole
|
|
|
no calls
|
PLM-Aging Inspection | 11/11/2013 | 11/11/2013 | 11/12/2013 | | PART |
Eric Strole
|
|
|
no calls
|
Plumbing Rough-in | 8/12/2013 | 8/13/2013 | 8/13/2013 | P | PASS |
Daryl Spivey
|
|
|
steve Phone #: ###-####
|
Plumbing Rough-in | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | PART |
Bill VanDegrift
|
|
|
steve Phone #: ###-#### last part of the ground work ok to cover
|
Groundwork | 5/24/2013 | 5/24/2013 | 5/24/2013 | P | PART |
Eric Strole
|
|
|
steve Phone #: ###-####-ok to cover east bath.
|
Groundwork | 5/23/2013 | 5/24/2013 | 5/23/2013 | A | CANC |
Eric Strole
|
|
|
groundwork r/i on inside of building//STeve Phone #: ###-#### -- cancelled insp per Steve, will call back to reschedule 5/23/13 3:58 leg
|
Groundwork | 5/16/2013 | 5/16/2013 | 5/16/2013 | P | PART |
Jim Johnson
|
|
|
outside piping on interceptor test ok
|
Groundwork | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Jim Johnson
|
|
|
Steve Phone #: ###-#### need additional cleanout installed in horizontal drain piping exceeding 135 degrees called contractor will recall when ready
|
Other | 5/13/2013 | 5/14/2013 | 5/14/2013 | A | DONE |
Eric Strole
|
|
|
This was a conferance on piping the grease interceptor.
|
Plumbing Rough-in | 5/10/2013 | 5/13/2013 | 5/13/2013 | A | PART |
Bill VanDegrift
|
|
|
Grease intecpter inspection-Steve Phone #: ###-#### tank set and with in 1" if the outlet, no other piping at this time.
|