Final | 5/31/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Salamon
|
Final | 5/30/2013 | 5/31/2013 | 5/31/2013 | A | PART |
Jim Johnson
|
|
|
Mitch Phone #: ###-#### need to provide atmospheric-type vacuum breaker,s for beauty sinks oked temp called contractor will recall when ready
|
Plumbing Rough-in | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | PART |
Jim Johnson
|
|
|
michael Phone #: ###-#### plumbing rough-in ok need to aquirea building permit for change of building occupancy
|
Plumbing Rough-in | 5/19/2013 | 5/20/2013 | 5/20/2013 | P | PEND |
Jim Johnson
|
|
|
Probably around noon or one oclock would be good. Phone #: ###-#### >> Inspection requested via web by michael harrison need to obtain all required permits need to contact Boise City commercial plan review at ###-#### for correct permit,s note plumbing rough-in test ok do not cover until all required permit,s and inspection,s have been done correction notice on site
|