Final | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Eric Strole
|
|
|
JOB CONTACT IS JAYSON Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | PART |
Eric Strole
|
|
|
JOB CONTACT - JEFF ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER-temp final ok, need tempered water to public lavs, backflows need tested and certified, need to finish laundry and set all fixtures.
|
Other | 7/11/2013 | 7/15/2013 | 7/15/2013 | A | PART |
Eric Strole
|
|
|
9:30 am-commerical washers require a hot and cold rpba, coffee maker requires a rpba, dishwasher requires a rpba, need hvb's on boiler bibs in pool room, cap off waterline to old trash compactor, soap dispensor requires it's own water supply and needs a rpba or an airgap, remove garbage disposal in kitchen and have all backflow devices tested and certified.
|
Final | 7/10/2013 | 7/11/2013 | 7/11/2013 | A | NR |
Eric Strole
|
|
|
job contact is Jeff Phone #: ###-#### >> Inspection requested via web by ADAM WARR-not ready
|
Plumbing Rough-in | 7/8/2013 | 7/9/2013 | 7/9/2013 | A | PART |
Eric Strole
|
|
|
JOB CONTACT - JAYSON ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER-laundry room pass
|
Groundwork | 6/13/2013 | 6/13/2013 | 6/13/2013 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS JAYSON Phone #: ###-#### >> Inspection requested via web by ADAM WARR-room 111 g/w pass
|
Plumbing Rough-in | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PART |
Daryl Spivey
|
|
|
JOB CONTACT IS JAYSON Phone #: ###-#### >> Inspection requested via web by ADAM WARR north end ADA remodel....ok to cover.........ds
|