Final | 8/16/2013 | 8/16/2013 | 8/16/2013 | P | PASS |
Eric Strole
|
|
|
|
Roof Drains | 6/18/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Eric Strole
|
|
|
1:00 pm-test and camera of storm drain pass
|
Other | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PART |
Bill VanDegrift
|
|
|
will test drains with Eric
|
Other | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | DONE |
Eric Strole
|
|
|
###-####- big bite-conferance on testing of stormdrains
|
Water and/or Sewer | 6/7/2013 | 6/10/2013 | 6/10/2013 | A | PART |
Eric Strole
|
|
|
clint Phone #: ###-####-test on 2" sewer pass. Still need to test and camera underground roof drains
|
Other | 5/28/2013 | 5/29/2013 | 5/29/2013 | P | PART |
Eric Strole
|
|
|
Test on lift station pass, Still need test on 2" from lift station to property line tie-in.
|
Final | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PART |
Eric Strole
|
|
|
Derek Phone #: ###-####-start of 24 hr test on lift station.
|
Other | 5/24/2013 | 5/28/2013 | 5/28/2013 | A | PART |
Eric Strole
|
|
|
Upstream and downstream piping and test on septic and fuel interceptor pass. Still need test and downstream piping on lift station.
|
Other | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | PART |
Eric Strole
|
|
|
Start of 24hr test on on interceptor and septic tank. water filled up to inside lower hub on san tees..
|
Water and/or Sewer | 5/21/2013 | 5/23/2013 | 5/23/2013 | A | PASS |
Eric Strole
|
|
|
On Site Supervisor is Clint Murphy. Phone #: ###-#### >> Inspection requested via web by Julie Schelhorn-conferance on piping of tanks.
|