Final | 8/28/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Daryl Spivey
|
|
|
call if problems when done//james Phone #: ###-####
|
Final | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PART |
Eric Strole
|
|
|
coke needs to be on its own rpba, water cooled for ice needs to be on its own rpba and potable water for ice needs to be taken off rpba and tied into potable being it has a air gap. temp occupancy ok.
|
Final | 8/16/2013 | 8/19/2013 | 8/19/2013 | P | CANC |
Eric Strole
|
|
|
Jeff will call you when ready for inspection. Phone #: ###-#### >> Inspection requested via web by James Staley Inspection cancelled from web by: James Staley
|
Final | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | FAIL |
Eric Strole
|
|
|
Jeff will call you when he is ready for inspection. Phone #: ###-#### >> Inspection requested via web by James Staley(NOT READY)
|
Final | 8/2/2013 | 8/5/2013 | 8/5/2013 | P | CANC |
Eric Strole
|
|
|
Jeff will give you a call when he is ready for inspection. Phone #: ###-#### >> Inspection requested via web by James Staley Inspection cancelled from web by: James Staley
|
Plumbing Rough-in | 7/3/2013 | 7/5/2013 | 7/5/2013 | P | PASS |
Eric Strole
|
|
|
Jeff will call you when he is ready. Phone #: ###-#### >> Inspection requested via web by Alicia Lease-Rough-in pass, need red line of changes on plans for hand sink and central health approval
|
Plumbing Rough-in | 7/2/2013 | 7/3/2013 | 7/3/2013 | P | CANC |
Eric Strole
|
|
|
Jeff will call you when he is ready for inspection. Phone #: ###-#### >> Inspection requested via web by Alicia Lease
|
Plumbing Rough-in | 7/1/2013 | 7/2/2013 | 7/2/2013 | P | NR |
Eric Strole
|
|
|
Please call Jeff to coordinate time for inspection. Phone #: ###-#### >> Inspection requested via web by Alicia Lease
|
Water and/or Sewer | 6/19/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Daryl Spivey
|
|
|
waste out to grease intercepter tested ok.........ds
|
Groundwork | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Alicia Lease-g/w pass
|
Groundwork | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | FAIL |
Eric Strole
|
|
|
Call Mile to coordinate time for inspection. Phone #: ###-#### >> Inspection requested via web by Alicia Lease-Need to plumb per approved plans. Need full size clean outs. Need to plumb for 3" mop sink into grease line. Need to fix all flat drains lines. Need to roll vents above invert. Need to change 3x2 Y that is installed backwards. Need to plmbing permit grouped to building permit. Need to test with 10' head of water or 5 psi of air.
|