Final | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Jim Johnson
|
|
|
|
Roof Drains | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Jim Johnson
|
|
|
will be ready Friday morning at 10 am. Bob is on site...his cell is above...Thank you so much!!! Phone #: ###-#### >> Inspection requested via web by susan love
|
Water and/or Sewer | 7/12/2013 | 7/15/2013 | 7/15/2013 | A | PASS |
Jim Johnson
|
|
|
water line test ok
|
Water and/or Sewer | 7/11/2013 | 7/12/2013 | 7/12/2013 | A | NR |
Jim Johnson
|
|
|
water line inspection...is ready for a pm inspection. Bob is onsite and his cell is ###-####. Thank you!!! >> Inspection requested via web by susan love not ready rescheduled for monday 7/15/13 am
|
Water and/or Sewer | 6/21/2013 | 6/24/2013 | 6/24/2013 | P | PART |
Jim Johnson
|
|
|
water line inspection...will be ready about 2:00 pm. Bob is on site with the above number. Thank you!!! Phone #: ###-#### >> Inspection requested via web by susan love new four inch sewer line to building test ok ok to cover
|
Groundwork | 6/19/2013 | 6/20/2013 | 6/20/2013 | P | NR |
Jim Johnson
|
|
|
Will be ready about 1:30 for inspection of tanks. Thank you.. The phone above is for Bob and he is on site. Phone #: ###-#### >> Inspection requested via web by susan love no sewer line no water line no roof drain piping at this time
|
Storm Drains | 6/18/2013 | 6/20/2013 | 6/19/2013 | A | CANC |
Jim Johnson
|
|
|
Bob is on site and that is his cell number..it will be ready about 10:30 am. Phone #: ###-#### >> Inspection requested via web by susan love Inspection cancelled from web by: susan love
|