Final | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | PASS |
Jim Johnson
|
|
|
The lav in the bathroom is now installed complete with mixing valves Thanks Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS
|
Final | 9/4/2013 | 9/4/2013 | 9/4/2013 | A | PART |
Jim Johnson
|
|
|
there is a wash fountain in the urinal room that wont be in for a week or who knows, i was hoping to still get a final and have you come look at it when it arrives. The rest of the project has to be finalled out this week,thanks Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS need to complete ice maker hook up need sink in urinal room installed need to pipe drain on rp in water heater room to floor sink oked temp. note no sign off card on site
|
Water and/or Sewer | 9/3/2013 | 9/3/2013 | 9/3/2013 | P | CANC |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS canc by contractor will recall when ready
|
Plumbing Rough-in | 7/23/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Jim Johnson
|
|
|
Bathroom rough in Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS
|
Groundwork | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PASS |
Jim Johnson
|
|
|
Door code 571 Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS
|
Groundwork | 7/9/2013 | 7/9/2013 | 7/9/2013 | P | FAIL |
Jim Johnson
|
|
|
the door code 571 the door is hard to open you have to really pull on it Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS need approved set of plans on site need to replumb combination waste and vent system as per I S P C 2009 called contractor will recall when ready
|