Final | 12/20/2013 | 12/20/2013 | 12/20/2013 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
Final | 12/19/2013 | 12/19/2013 | 12/19/2013 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker need to provide P V B for eye wash over mop sink or shorten hose on eye wash for one inch air gap above mop sink flood level rim called contractor will recall wen ready for final
|
Plumbing Rough-in | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 10/9/2013 | 10/9/2013 | 10/9/2013 | A | PART |
Jim Johnson
|
|
|
North side of bld ready for rough-in inspection Rain drains ready for inspection Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 10/9/2013 | 10/9/2013 | 10/9/2013 | A | PART |
Jim Johnson
|
|
|
North side of bld ready for rough-in inspection Rain drains ready for inspection Phone #: ###-#### >> Inspection requested via web by Travis Baker rough-in on D W V on north side of building test ok roof and overflow drain,s test ok in wall water ok to cover need to lower water lines in overhead and provide tenting over water piping as per conversation with plumber on site will check tenting on water when contractor call,s for rough-in on south side of building
|
Groundwork | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker water service in ok............ds
|
Groundwork | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|