Final | 10/4/2013 | 10/7/2013 | 10/7/2013 | P | FAIL |
Bill VanDegrift
|
|
|
JOB # 17101. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes tub shoe east side 1st floor leak, no test 2nd floor west side
|
Card not on site to sign | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Bill VanDegrift
|
|
|
JOB CONTACT IS CHRIS Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PART |
Jim Johnson
|
|
|
JOB CONTACT - MARK ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER need tp provide identification tag,s for backflow,s located in starbuck under counter need to provide separate water supply protected with an RP for milk canister washer located in hand sink in starbuck and remove double y hose bib adapter from faucet on hand sink need to provide an RP on ro system in pharmacy located under sink need to provide an RP on ice making machine located at front of store contractor to recall when ready
|
Other | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | PART |
Eric Strole
|
|
|
ok to open starbucks when backflows are tested and certified
|
Other | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | NR |
Eric Strole
|
|
|
PARTIAL FINAL INSPECTION. RILEY IS THE CONTACT Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Plumbing Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PART |
Bill VanDegrift
|
|
|
JOB CONTACT IS RILEY Phone #: ###-#### >> Inspection requested via web by ADAM WARR Starbucks and pharmacy ri ok to cover
|
Groundwork | 8/1/2013 | 8/2/2013 | 8/2/2013 | P | PART |
Bill VanDegrift
|
|
|
WOULD PREFER A LATE AFTERNOON INSPECTION IF POSSIBLE. CONTACT IS HENRY ###-####. Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS two floor sinks just inside the south doors ok to cover
|
Groundwork | 8/1/2013 | 8/2/2013 | 8/1/2013 | A | CANC |
Eric Strole
|
|
|
JOB CONTACT - HENRY ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: LENNIE BUSS
|