Final | 11/7/2013 | 11/7/2013 | 11/7/2013 | A | PASS |
Jim Johnson
|
|
|
2nd or 3rd door should be open. Please call Jim @ ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by James Solosabal
|
Plumbing Rough-in | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Jim Johnson
|
|
|
This is under a water pressure test for both water and sewer. Phone #: ###-#### >> Inspection requested via web by James Solosabal
|
Groundwork | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PASS |
Daryl Spivey
|
|
|
** THIS ALSO NEEDS THE SEWER INSPECTION. Phone #: ###-#### >> Inspection requested via web by James Solosabal build. sewer tested also.............ds
|