Final | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting final ok
|
Card not on site to sign | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|
Final | 12/11/2013 | 12/12/2013 | 12/12/2013 | P | PEND |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-All corrections complete except spout listings.
|
Final | 12/9/2013 | 12/10/2013 | 12/10/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting1-NEED TO CAULK DRINKING FOUNTAIN. 2-NEED TO TEST WATER HEATER FLUE. 3-NEED THE LISTING'S FOR FAUCETS AND SPOUTS.4-NEED LISTING FOR ANTIFREEZE USED FOR WATERLINES. 5-NEED TO CAP OFF WATERLINE BEFORE DBCA.
|
Final | 11/25/2013 | 11/25/2013 | 11/26/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-1-NEED LISTINGS FOR LAV FCTS AND SPOUTS. 2-NEED LISTINGS FOR SHOWER VALVES. 3-NEED A WAY TO BLOW OUT WATERLINES FOR WINTER. 4-NEED TEMPERED WATER OFF 120 DEGREE OR LESS TO LAVS AND SHOWERS (CANNOT USE WATER HEATER). 5-NEED TO CAP OFF WATERLINE DOWNSTREAM OF BACKFLOWS OR ADD ANOTHER BACKFLOW. 6-NEED TO INSTALL DRINKING FOUNTAIN. 7-NEED TO INSTALL 2 OUTSIDE SHOWER VALVES. 8-BACKFLOWS NEED TESTWD AND CERTIFIED. 9-NEED TO TEST WATER HEATER FLUE 10-NEED COMBUSTION AIR FOR WATER HEATER. 11-NEED LETTER FROM OWNER TAKING RESPONSIBILITY FOR WINTERIZATION.
|
Plumbing Rough-in | 11/7/2013 | 11/7/2013 | 11/8/2013 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|
Water and/or Sewer | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | CANC |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | CANC |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | PASS |
Bill VanDegrift
|
|
|
ok to pour walls inside both sides
|
Plumbing Rough-in | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | NR |
Eric Strole
|
|
|
Partial rough in insection Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|
Plumbing Rough-in | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-No pex joints aloud in concrete
|
Groundwork | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Erin Whiting-g/w pass. still need sewer hook-up.
|
Plumbing Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PART |
Eric Strole
|
|
|
partial rough-in for dwv in concrete walls. Still need sewer hook-up and the rest of the ground work and rough-in.
|
Plumbing Rough-in | 9/6/2013 | 9/9/2013 | 9/9/2013 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|
Groundwork | 8/8/2013 | 8/8/2013 | 8/8/2013 | A | PASS |
Daryl Spivey
|
|
|
|
Plumbing Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|