Water and/or Sewer | 12/27/2013 | 12/30/2013 | 12/30/2013 | A | CANC |
Daryl Spivey
|
|
|
Basement door will be open so just go in and the bathroom is straight ahead Phone #: ###-#### >> Inspection requested via web by Craig Allumbaugh
|
Final | 12/30/2013 | 12/30/2013 | 12/30/2013 | A | PASS |
Daryl Spivey
|
|
|
Basement door will be open so just go in and the bathroom is straight ahead Phone #: ###-#### >> Inspection requested via web by Craig Allumbaugh Main bath in basement finished with washer....bathroom in laundry room was a rough in only as a future and needs to be repermitted when that is completed.............ds
|
Water and/or Sewer | 10/9/2013 | 10/10/2013 | 10/10/2013 | P | CANC |
Daryl Spivey
|
|
|
Door downstairs is open Phone #: ###-#### >> Inspection requested via web by Craig Allumbaugh
|
Plumbing Rough-in | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PASS |
Daryl Spivey
|
|
|
Door downstairs is open Phone #: ###-#### >> Inspection requested via web by Craig Allumbaugh
|
Groundwork | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Daryl Spivey
|
|
|
Harold Phone #: ###-####
|