Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Boe Jares
|
Other | 10/18/2013 | 10/18/2013 | 10/18/2013 | A | PASS |
Bill VanDegrift
|
|
|
talked to plumber about hooking up soaker waste
|
Plumbing Rough-in | 10/5/2013 | 10/7/2013 | 10/7/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Boe Jares
|
Plumbing Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | P | FAIL |
Eric Strole
|
|
|
job will be ready at noon Phone #: ###-#### >> Inspection requested via web by Boe Jares-Horizontal wet vents are for bath groups only. No half baths.
|