Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberPLM13-02970
StatusFinaled
Name DEBEST PLUMBING INC
Site Address 8800 W EMERALD ST
Project Name 
Customer Number1344
ePlanReviewNo
Description
Plumbing Permit - New: Danitary DWV, Domestic water, rain drains, fixtures, MED GAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/5/201412/5/201412/5/2014PPASS
DetailsDaryl Spivey
if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Called Debest and talked to Stacia. This permit was for grading and drainage only. to pull permit for all roughiin and final plumbing on different permit and value it according to that work..................Attach to BLD13-01688..........ds
Plumbing Rough-in11/26/201412/1/201412/1/2014PPASS
DetailsJim Johnson
Decontam Area. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Groundwork11/24/201411/24/201411/24/2014PPASS
DetailsJim Johnson
decontam area, if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Groundwork11/10/201411/10/201411/10/2014PPASS
DetailsJim Johnson
for Decontam area. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Final11/4/201411/5/201411/5/2014APART
DetailsJim Johnson
Final ONLY for Dr''s Lounge, Anestestia Room, & Decontamination. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann final ok for dr lounge anestestia room and decontamination area
Plumbing Rough-in10/24/201410/24/201410/24/2014PPASS
DetailsJim Johnson
RI decontamination clinical sink. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Plumbing Rough-in10/21/201410/21/201410/21/2014PPASS
DetailsJim Johnson
decontamination area. if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Groundwork10/15/201410/15/201410/15/2014PPART
DetailsBill VanDegrift
for decontamination. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann relocat clinical sink, add two floor sinks and a three compartment sink and indirect for the endoscopy equipment
Med/Gas Systems9/17/20149/18/20149/18/2014APASS
DetailsJim Johnson
24 hr pressure test ok
Med/Gas Systems9/17/20149/17/20149/17/2014PPART
DetailsJim Johnson
if questions please call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test
Plumbing Rough-in9/15/20149/16/20149/16/2014APASS
DetailsJim Johnson
PreOp Area Wall RI. if questions call Kevin ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann rough-in on two sink,s test ok ok to cover
Groundwork9/10/20149/11/20149/11/2014APASS
DetailsJim Johnson
U/G. if questions call Kevin @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Final8/27/20148/28/20148/28/2014APART
DetailsJim Johnson
TEMP FINAL for Lockerrooms. if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann locker room,s final ok oked temp
Final8/27/20148/28/20148/27/2014ACANC
DetailsJim Johnson
PARTIAL Final for Lockerrooms. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Final7/31/20148/1/20148/1/2014APART
DetailsBill VanDegrift
TEMP FINAL in PACU Room. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann temp occ ok picked up med gas cert
Plumbing Rough-in7/28/20147/28/20147/28/2014PPASS
DetailsJim Johnson
ceiling cover inspection. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Plumbing Rough-in7/17/20147/18/20147/18/2014APASS
DetailsJim Johnson
Locker room area. if questions call Donny @ Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Groundwork7/14/20147/14/20147/14/2014PPASS
DetailsJim Johnson
for the locker rooms. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann locker room D W V rest room,s test ok ok to cover
Plumbing Rough-in7/11/20147/11/20147/11/2014PPART
DetailsJim Johnson
overhead D W V vent,s test ok overhead water test ok
Med/Gas Systems7/8/20147/9/20147/9/2014PPASS
DetailsJim Johnson
24 hr pressure test ok
Med/Gas Systems7/8/20147/8/20147/8/2014PPART
DetailsJim Johnson
med gas 24hr test PACU. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test
Plumbing Rough-in6/25/20146/26/20146/26/2014PPART
DetailsDaryl Spivey
PACU Walls. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
ok to cover..........ds
Final6/25/20146/26/20146/26/2014APART
DetailsDaryl Spivey
TEMP final Only - Lab Area 2A Phase 2A. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
1 sink with eyewash ok..........ds
Plumbing Rough-in6/24/20146/24/20146/24/2014PPART
DetailsJim Johnson
PACU Area. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann in wall rough-in on 7 sink,s test ok ok to cover
Med/Gas Systems6/20/20146/23/20146/23/2014APART
DetailsJim Johnson
24 hr pressure test on med gas test ok
Med/Gas Systems6/20/20146/20/20146/20/2014PPART
DetailsJim Johnson
med gas pressure test. BEFORE 3pm if possible. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test
Groundwork6/19/20146/19/20146/19/2014PFAIL
DetailsJim Johnson
PACU AREA. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann need to vent upstaires water closet in an approved method talked with plumber on site will recall when ready
Med/Gas Systems6/17/20146/18/20146/18/2014APART
DetailsJim Johnson
24 hr pressure test on med gas test ok
Med/Gas Systems6/16/20146/17/20146/17/2014APART
DetailsJim Johnson
med gas pressure test. if questions please contact Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test
Med/Gas Systems6/5/20146/6/20146/6/2014PPART
DetailsJim Johnson
phase 2 part B in wall 24 hr pressure test on med gas test ok ok to cover
Med/Gas Systems6/5/20146/5/20146/5/2014PPART
DetailsJim Johnson
Phase 2 Part B - if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test for in wall med gas in phase2 part b
Med/Gas Systems6/3/20146/4/20146/4/2014PPASS
DetailsJim Johnson
24 hr pressure test on med gas test ok
Med/Gas Systems6/3/20146/3/20146/3/2014PPART
DetailsJim Johnson
med gas pressure test - 4 patient rooms- if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test on med gas
Plumbing Rough-in5/8/20145/9/20145/9/2014APART
DetailsJim Johnson
LATE MORNING IF POSSIBLE.
PHASE 2-B PATIENT ROOMS Phone #: ###-#### >> Inspection requested via web by Stacia Haumann hand sink in phase 2-B west side of building test ok ok to cover
Med/Gas Systems4/30/20145/1/20145/1/2014APASS
DetailsJim Johnson
jim Phone #: ###-####
Med/Gas Systems4/30/20144/30/20144/30/2014PPART
DetailsJim Johnson
med vacuum pressure test. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test on vacuum
Final4/15/20144/16/20144/16/2014APART
DetailsJim Johnson
OR Addition ONLY final. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann phase 1 OR addition temp final ok need 3rd party med gas certification report for final contractor to call when ready
Plumbing Rough-in4/4/20144/7/20144/7/2014APASS
DetailsJim Johnson
Ceiling Cover AREA C. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Plumbing Rough-in3/27/20143/28/20143/28/2014APART
DetailsEric Strole
Above Ceiling RI cover. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann-ok to install section of ceiling tile that is marked on plans.
Groundwork3/24/20143/25/20143/25/2014APASS
DetailsJim Johnson
Cafeteria - if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann ground work and roughin test ok ok to cover
Med/Gas Systems3/25/20143/25/20143/25/2014APASS
DetailsJim Johnson
24 hr pressure test on main, in hall area test ok
Med/Gas Systems3/21/20143/24/20143/24/2014APART
DetailsJim Johnson
24 hr pressure test for or#6 test ok on med gas
Plumbing Rough-in3/21/20143/21/20143/21/2014PPART
DetailsJim Johnson
Cafeteria. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann in wall water in cafeteria test ok
Med/Gas Systems3/21/20143/21/20143/21/2014PPART
DetailsJim Johnson
OR#6. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 pressure test for med gas in or#6
Med/Gas Systems3/19/20143/20/20143/20/2014APART
DetailsJim Johnson
24 hr pressure test on med gas for or#5 test ok
Med/Gas Systems3/19/20143/19/20143/19/2014PPART
DetailsJim Johnson
Medical gas pressure test on Operating Room #5. Questions call Donny ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test in or#5 on med gas
Plumbing Rough-in3/19/20143/19/20143/19/2014PPART
DetailsJim Johnson
hot and cold main water line,s in hall overhead test ok ok to cover
Med/Gas Systems3/14/20143/17/20143/17/2014APASS
DetailsJim Johnson
24 hr pressure test in or#4 test ok
Final3/13/20143/14/20143/14/2014PPART
DetailsJim Johnson
ONLY FOR PATIENT ADDITION. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann made walk through with contractor
Med/Gas Systems3/13/20143/14/20143/14/2014PPART
DetailsJim Johnson
OR#4. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test on med gas in or#4
Plumbing Rough-in2/26/20142/27/20142/27/2014APART
DetailsJim Johnson
Overhead OR Area A & B. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann overhead rough-in marked on plan test ok ok to cover
Med/Gas Systems2/17/20142/18/20142/18/2014APART
DetailsJim Johnson
Area C - Walls, OR Addition - Med Gas Pressure Test. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 24 hr pressure test for in wall med gas marked on plan test ok
Plumbing Rough-in2/17/20142/18/20142/18/2014APASS
DetailsJim Johnson
patient addition - Ceiling inspection. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Plumbing Rough-in2/13/20142/14/20142/14/2014PPART
DetailsJim Johnson
AREA C. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann in wall plumbing rough-in in area C test ok start of 24 hr in wall med gas pressure test
Med/Gas Systems2/12/20142/13/20142/13/2014PPART
DetailsJim Johnson
24 hr pressure test on porsion of med gas marked on plan test ok
Roof Drains2/12/20142/12/20142/12/2014PPART
DetailsJim Johnson
Rain Drains - If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann roof and overflow drain,s on west and south west side of building test ok still need to test two roof and overflow drain,s on south east side of building
Med/Gas Systems2/12/20142/12/20142/12/2014PPART
DetailsJim Johnson
Med Gas Pressure Test. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test west south side of building
Med/Gas Systems2/10/20142/10/20142/11/2014PPART
DetailsJim Johnson
med gas 24hr pressure test. if questions call Donny @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 24 hr pressure test on med gas marked on plan test ok
Plumbing Rough-in2/6/20142/7/20142/7/2014PPART
DetailsJim Johnson
AREA A&B & Patient Addition - Soiled Work Room. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann in wall rough-in for dwv and water in area A marked on plan test ok ok to cover
Med/Gas Systems2/6/20142/7/20142/7/2014PPART
DetailsJim Johnson
med gas AREA A. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann start of 24 hr pressure test on med gas marked on plan
Plumbing Rough-in1/16/20141/17/20141/17/2014APART
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann hot and cold water lines in hall on north side of building test ok
Final1/15/20141/15/20141/15/2014PPART
DetailsJim Johnson
PARTIAL Final. if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann final on sink in area phase 1-A ok jej
Med/Gas Systems1/10/20141/13/20141/13/2014APART
DetailsJim Johnson
MED GAS 24hr Test. if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 24 hr pressure test on med gas marked on plan test ok
Plumbing Rough-in1/9/20141/10/20141/10/2014PPART
DetailsJim Johnson
if questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann D W V and water on east side of building marked on contractor plan test ok ok to cover
Med/Gas Systems1/3/20141/6/20141/6/2014APART
DetailsJim Johnson
MED GAS RI. if questions call Kevin @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann portion of med gas marked on plan 24hr pressure test ok
Plumbing Rough-in1/3/20141/3/20141/3/2014PPART
DetailsJim Johnson
partial RI, Patient Addition, west side. If questions call Donny @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann portion of water and D W V test ok and med gas under 24 hr test marked on contractor plan
Groundwork12/20/201312/20/201312/20/2013PPASS
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
Groundwork12/17/201312/18/201312/18/2013APART
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann portion of truck line and one bath room and floor drain,s on south west side test ok
Groundwork12/13/201312/16/201312/16/2013APART
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann ground work on south-east side of building test ok
Plumbing Rough-in12/2/201312/3/201312/3/2013APART
DetailsJim Johnson
if questions please contact Kevin @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann roof and overflow drains test ok
Plumbing Rough-in11/7/201311/8/201311/8/2013APART
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann rough-in for one hand sink test ok ok to cover
Groundwork11/5/201311/5/201311/5/2013PPASS
DetailsJim Johnson
if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann relocation of sink groundwork test ok ok to cover
Groundwork10/25/201310/25/201310/25/2013PPASS
DetailsDaryl Spivey
if questions please call Kevin ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
marked off on prints..........ds
Groundwork10/22/201310/23/201310/23/2013APART
DetailsJim Johnson
please call Kevin when your on your way ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 4 & 3 inch trunk lines for dwv test ok ok to cover rain drain 6 & 4 inch lines under ground test ok ok to cover