Final | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | | | 7/31/2014 | | DONE |
Christina Prado
|
|
|
Per inspection notes dated 6/26/14
|
Final | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | PASS |
Eric Strole
|
|
|
Partial Final inspection Phone #: ###-#### Inspection requested via web by Erin Whiting
|
Other | 5/13/2014 | 5/15/2014 | 5/15/2014 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 3/6/2014 | 3/6/2014 | 3/6/2014 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting Dwv pass, waiting on call back for winter blow out.
|
Plumbing Rough-in | 3/4/2014 | 3/5/2014 | 3/5/2014 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-DWV mechanical room test fail. All waterlines in 2x4 exterior walls require 3-1/2" of insulation or equal a r-19. Overhead waterlines between bath and mechanical room needs to be protected from freezing.
|
Plumbing Rough-in | 2/13/2014 | 2/14/2014 | 2/14/2014 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting Inspection cancelled from web by: Erin Whiting
|
Plumbing Rough-in | 2/12/2014 | 2/13/2014 | 2/13/2014 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-NOT READY
|
Plumbing Rough-in | 11/13/2013 | 11/14/2013 | 11/14/2013 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting-This is a ground work.Pass
|
Plumbing Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting Inspection cancelled from web by: Erin Whiting
|