Final | 4/23/2014 | 4/23/2014 | 4/23/2014 | P | PASS |
Eric Strole
|
|
|
ask for justin Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
|
PLM-Aging Inspection | 4/16/2014 | 4/16/2014 | 4/22/2014 | | PEND |
Eric Strole
|
|
|
Contractor will check on backflow and call for inspection.
|
Final | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PART |
Eric Strole
|
|
|
ok to cover, pvb needs tested and certified.
|
Water and/or Sewer | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Justin Whitt-well disconnest ok. Still need to run waterline.
|