Final | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | PASS |
Bill VanDegrift
|
|
|
Chris Phone #: ###-####
|
Final | 3/19/2014 | 3/20/2014 | 3/20/2014 | P | PART |
Jim Johnson
|
|
|
Please call Chris with McDaniel Plumbing 30 - 45 minutes prior to arriving for access. ###-#### Phone #: ###-#### >> Inspection requested via web by chris mcdaniel need premius protection double check tested and ertified need open frount seat on water closet need 120 degree hot water limitation to lav talked to contractor on site contractor to recall when ready
|
Plumbing Rough-in | 2/21/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Jim Johnson
|
|
|
Please call Chris @ ###-#### 30 - 45 before arriving for access. If you can''t reach Chris please call Greg @ ###-####. Phone #: ###-#### >> Inspection requested via web by chris mcdaniel
|
Plumbing Rough-in | 2/18/2014 | 2/19/2014 | 2/19/2014 | P | FAIL |
Jim Johnson
|
|
|
Please call Chris McDaniel @ ###-#### (cell) 30 - 45 minutes prior to arrival for access. If you cannot reach Chris please call Greg @ ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by chris mcdaniel need an additional two inch vent through roof to equal cross-sectional venting for three inch building drain called contractor will recall when ready
|
Groundwork | 12/17/2013 | 12/18/2013 | 12/18/2013 | P | PASS |
Jim Johnson
|
|
|
Please contact Greg Brugato before arriving on site. Building is locked and Greg Brugato will arrive to let inspector in. Greg''s # is ###-####. Phone #: ###-#### >> Inspection requested via web by chris mcdaniel
|