Final | 4/24/2014 | 4/25/2014 | 4/25/2014 | A | PASS |
Jim Johnson
|
|
|
Addition bathroom is ready for inspection. Toilet, shower and two lavatories. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PASS |
Jim Johnson
|
|
|
Top out ri inspection. It is under test. Lock box on site if door is not open. Call for combo. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Groundwork | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Jim Johnson
|
|
|
Job is ready for inspection. Door is open at far west end in front. Crawlspace to right of front door. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|