Final | 4/24/2014 | 4/24/2014 | 4/24/2014 | A | PASS |
Daryl Spivey
|
|
|
Bathroom upstairs is ready for final. Two lavatories, shower, toilet and AW Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 | P | PASS |
Daryl Spivey
|
|
|
Job is ready this am. Test will be on drains and waters. RI for shower, aw, pan drain and lavatory basins (2) Thank you. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 | A | CANC |
Daryl Spivey
|
|
|
|
Plumbing Rough-in | 3/6/2014 | 3/7/2014 | 3/7/2014 | P | NR |
Bill VanDegrift
|
|
|
Will be ready for inspection in the afternoon. Call Reg to confirm he is ready if before 3pm. ####-#### Phone #: ###-#### >> Inspection requested via web by Scott Sparrell will recall
|
Plumbing Rough-in | 3/6/2014 | 3/7/2014 | 3/6/2014 | A | CANC |
Daryl Spivey
|
|
|
RI of drains/vents and waters in floor of upper level bathroom. It is under test and ready by 9am. Thanks. Scott. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell Inspection cancelled from web by: Scott Sparrell
|