Final | 9/10/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Bill VanDegrift
|
|
|
KEY TO MECH. ROOM IS ON TOP OF POWER PANEL TO THE RIGHT Phone #: ###-#### Inspection requested via web by Rob Bristol final ok
|
Card not on site to sign | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Bill VanDegrift
|
|
|
KEY TO MECH. ROOM IS ON TOP OF POWER PANEL TO THE RIGHT Phone #: ###-#### Inspection requested via web by Rob Bristol no card
|
Final | 9/5/2014 | 9/8/2014 | 9/8/2014 | P | NR |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rob Bristol not ready contractor to recall when ready
|
Water and/or Sewer | 8/13/2014 | 8/13/2014 | 8/14/2014 | A | PART |
Bill VanDegrift
|
|
|
United Water is ok with the two buildings on the existing service. water service ok.
|
Water and/or Sewer | 8/5/2014 | 8/6/2014 | 8/6/2014 | A | NR |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol need approval from united water to tie water service to existing service to sales building down the street.
|
Plumbing Rough-in | 6/10/2014 | 6/11/2014 | 6/11/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rob Bristol
|
Water and/or Sewer | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | PASS |
Jim Johnson
|
|
|
Sewer line inspection only! Phone #: ###-#### >> Inspection requested via web by Rob Bristol
|
Water and/or Sewer | 4/3/2014 | 4/4/2014 | 4/4/2014 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rob Bristol started test on interceptor sewer line rom interceptor to sanitary sewer line tie in in front of building test ok
|
Groundwork | 3/27/2014 | 3/28/2014 | 3/28/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rob Bristol
|