Final | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Eric Strole
|
|
|
as per Dave Hannah-Carl Phone #: ###-####
|
PLM-Aging Inspection | 5/18/2015 | 5/18/2015 | 5/18/2015 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/16/2015 | 2/16/2015 | 2/17/2015 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 11/17/2014 | 11/17/2014 | 11/17/2014 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 8/18/2014 | 8/18/2014 | 8/18/2014 | | PART |
Eric Strole
|
|
|
wip
|
Storm Drains | 4/18/2014 | 4/21/2014 | 4/21/2014 | A | PART |
Bill VanDegrift
|
|
|
If there is any possibility of a PM inspection today (Friday 18th of April) Darren Spiers would appreciate it. ###-#### Thank you Phone #: ###-#### >> Inspection requested via web by judy patton this is the one I inspected Friday.
|
Storm Drains | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PART |
Bill VanDegrift
|
|
|
2- 4" runs south to catch basins tests ok
|
Storm Drains | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PART |
Daryl Spivey
|
|
|
Mike Jackson is the Foreman On-Site. Thank you Phone #: ###-#### >> Inspection requested via web by judy patton continuation of line bedded ok........will test when box is set.................ds
|
Storm Drains | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PART |
Bill VanDegrift
|
|
|
just past the 8" offset east side center
|
Storm Drains | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | PART |
Eric Strole
|
|
|
Please call Mike Jackson ###-#### with ETA. Thank you Phone #: ###-#### >> Inspection requested via web by judy patton-section complete pass
|
Storm Drains | 4/9/2014 | 4/10/2014 | 4/10/2014 | P | PART |
Eric Strole
|
|
|
Test pass.
|
Storm Drains | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PART |
Eric Strole
|
|
|
Mike Jackson is the Super on the Boise Heights project please call with ETA ###-####. Phone #: ###-#### >> Inspection requested via web by judy patton-Start of 24 hr test on the 2 parking lot drains on east side and sump. Still need some piping on west side and 2 more parking lot drains on west side.
|
Water and/or Sewer | 4/2/2014 | 4/3/2014 | 4/3/2014 | A | PART |
Eric Strole
|
|
|
Mike Jackson is requesting an inspection for the work completed on 4-2-14. Inspector was on-site 4-2 but an adjustment needed to be made and the inspector left. Please call Mike Jackson(Super) with ETA on 4-3 in AM Phone #: ###-#### >> Inspection requested via web by judy patton-section complete ok to cover.
|
Storm Drains | 4/2/2014 | 4/2/2014 | 4/2/2014 | P | PART |
Eric Strole
|
|
|
section complete ok to cover
|
Water and/or Sewer | 3/31/2014 | 3/31/2014 | 3/31/2014 | A | NR |
Eric Strole
|
|
|
Not ready, need to group plumbing permit with building permit.
|
Storm Drains | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | CANC |
Eric Strole
|
|
|
Mike Jackson will be the Super on-site. Please call with ETA. Phone #: ###-#### >> Inspection requested via web by judy patton
|