Final | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | PASS |
Daryl Spivey
|
|
|
kitchen finished..........ds
|
Final | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT - JOSH ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER temp occ ok needs wait station fixtures set
|
Final | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | NR |
Daryl Spivey
|
|
|
D/W drain to be ran, need backflow protection on ice maker and all equipment set and hooked up..........ds
|
Plumbing Rough-in | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | PART |
Daryl Spivey
|
|
|
JOB CONTACT - BRANDON ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER scullery kitchen mop sink, sink and sink above on next floor replumbed............ds
|