Final | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | PASS |
Eric Strole
|
|
|
Job is ready for final. Thanks Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Water and/or Sewer | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Eric Strole
|
|
|
Exterior sewer line connection from addition garage plumbing to existing main line in yard. Under test. Thanks. Scott. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 4/24/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Eric Strole
|
|
|
Building addition is in rough phase. Access open. Groundwork and ri plumbing are under test. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|