Final | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 4/27/2015 | 4/27/2015 | 4/27/2015 | | PART |
Bill VanDegrift
|
|
|
I dont know what I'm doing with this inspection. WIP
|
PLM-Aging Inspection | 1/26/2015 | 1/26/2015 | 1/26/2015 | | PART |
Eric Strole
|
|
|
wip
|
Storm Drains | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Eric Strole
|
|
|
storm drains complete.
|
Storm Drains | 10/7/2014 | 10/7/2014 | 10/7/2014 | P | PART |
Eric Strole
|
|
|
C-wing west side test pass and building L test pass ok to cover.
|
Storm Drains | 10/7/2014 | 10/7/2014 | 10/7/2014 | A | PART |
Eric Strole
|
|
|
F-wing south side pass, c-wing west side ok to cover still need to test.
|
Storm Drains | 10/2/2014 | 10/3/2014 | 10/3/2014 | P | PART |
Eric Strole
|
|
|
test on storm drains from last inspection pass and test on E-wing south side pass.
|
Storm Drains | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PART |
Eric Strole
|
|
|
storm drains for A-B & E wing north side ok to cover, still need to test
|
Storm Drains | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PART |
Eric Strole
|
|
|
storm drains for b&c pass.
|
Storm Drains | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PART |
Eric Strole
|
|
|
Need to use approved fittings.
|
Water and/or Sewer | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | CANC |
Eric Strole
|
|
|
|
Storm Drains | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PART |
Eric Strole
|
|
|
Upper end of Building h storm drains pass and d common's up to 10' of building pass.
|
Water and/or Sewer | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PART |
Eric Strole
|
|
|
Test on sewers pass, still need storm drains installed and tested.
|
Storm Drains | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | PART |
Eric Strole
|
|
|
Sections ok to cover are marked on plans. Still needs tested
|
Water and/or Sewer | 7/2/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Eric Strole
|
|
|
Building 1 & 2 sewer ok to cover. Still need to test.
|
Water and/or Sewer | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PART |
Eric Strole
|
|
|
building # 5 sewer ok to cover, still needs tested.
|
Water and/or Sewer | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/14/2014 | 5/16/2014 | 5/16/2014 | A | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | PART |
Eric Strole
|
|
|
building 4 pass
|
Water and/or Sewer | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | FAIL |
Eric Strole
|
|
|
building 4 still fail.
|
Water and/or Sewer | 5/7/2014 | 5/7/2014 | 5/7/2014 | P | PART |
Eric Strole
|
|
|
building 1 & 2 ok to cover 1st 20 ft, building 3, 5, 6 ,j ok to cover. building 4 need to fix flat grade. all sewer still needs tested.
|
Water and/or Sewer | 5/7/2014 | 5/7/2014 | 5/7/2014 | A | PART |
Eric Strole
|
|
|
4 sewers ok to cover, marked on plans. 1 sewer has backgrade. still need to test all sewers. 3 sewers are covered without inspection and will be camered.
|