Final | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PASS |
Eric Strole
|
|
|
Andy Bouck Phone #: ###-####
|
Plumbing Rough-in | 6/24/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Eric Strole
|
|
|
###-####
|
Water and/or Sewer | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | CANC |
Eric Strole
|
|
|
Hi please inspect plumbing rough in we will be using two emax tank less water heaters at the two sinks thank you Phone #: ###-#### Inspection requested via web by william bouck
|
Water and/or Sewer | 6/17/2014 | 6/18/2014 | 6/18/2014 | A | PASS |
Eric Strole
|
|
|
plumbing ground work Phone #: ###-#### >> Inspection requested via web by william bouck-This was for a ground work
|
Groundwork | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | FAIL |
Eric Strole
|
|
|
plumbing ground work toilet , lav and break room sink Phone #: ###-#### >> Inspection requested via web by william bouck-need approved plans on site and need to group plumbing permit with building permit.
|