Final | 8/22/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Jim Johnson
|
|
|
Site foreman, Paul Thompson, ###-####. New constr plumbing final trim. Note: HVAC company is installing the water heater,not us. Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Plumbing Rough-in | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Jim Johnson
|
|
|
PLUMBING ROUGH IN Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Plumbing Rough-in | 6/19/2014 | 6/19/2014 | 6/20/2014 | P | FAIL |
Jim Johnson
|
|
|
RI REINSP Phone #: ###-#### >> Inspection requested via web by Chris Field need to vent water closet with an approved method contractor to recall when ready
|
Plumbing Rough-in | 6/17/2014 | 6/18/2014 | 6/18/2014 | A | FAIL |
Jim Johnson
|
|
|
plumbing rough in Phone #: ###-#### >> Inspection requested via web by Chris Field need to repipe overhead horizontal wet vent as per 908.2 the water closet fixture drain shall be downstream of any fixture drain or trap correction notice on site contractor to recall when ready
|