Final | 7/31/2014 | 7/31/2014 | 7/31/2014 | P | PASS |
Bill VanDegrift
|
|
|
Bill, John is installing the valve and new T;P right now and will be ready at 2:00.
Thank you, Robert Inspection requested via web by Brent Lacy final ok
|
Final | 7/30/2014 | 7/31/2014 | 7/31/2014 | A | FAIL |
Bill VanDegrift
|
|
|
Backflow was tested Wednesday morning and it is now ready for final.
Thank you, Robert Phone #: ###-#### Inspection requested via web by Brent Lacy shut off valve required upstream of dcva, replace t&p relief line with approved material and needs an air gap at the termination.
|
Plumbing Rough-in | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | PASS |
Jim Johnson
|
|
|
Will Be ready at 3:30 PM - Thank you - Robert Phone #: ###-#### >> Inspection requested via web by Brent Lacy
|