Final | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Bill VanDegrift
|
|
|
call the GC, Curtis for access // (contractor is Bob ###-####) Phone #: ###-####
|
Plumbing Rough-in | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | PASS |
Eric Strole
|
|
|
Bob Phone #: ###-####
|
Groundwork | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | PASS |
Bill VanDegrift
|
|
|
bob Phone #: ###-#### gw in garage ok
|
Plumbing Rough-in | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | PART |
Eric Strole
|
|
|
bob Phone #: ###-####-partial r/i of inwall plumbing to sink only
|