Final | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | PASS |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 12/8/2015 | 12/8/2015 | 12/8/2015 | P | PART |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need all backflows tested and certified. Temp final ok.
|
PLM-Aging Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 6/16/2015 | 6/16/2015 | 6/16/2015 | A | PART |
Eric Strole
|
|
|
Test and r/i of water complete except 1 room at far right back room.
|
Other | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | DONE |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-This was to leave a correction notice that the spray hose for the bed pan washers need to be isolated with a rpba.
|
Plumbing Rough-in | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PART |
Eric Strole
|
|
|
Test on all dwv pass
|
Plumbing Rough-in | 3/6/2015 | 3/9/2015 | 3/10/2015 | A | NR |
Eric Strole
|
|
|
BRIAN IS JOB CONTACT ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PART |
Eric Strole
|
|
|
BRIAN IS JOB CONTACT ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-DWV west side test pass
|
Plumbing Rough-in | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PART |
Eric Strole
|
|
|
BRIAN H IS JOB CONTACT, ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-DWV east side test pass.
|
Plumbing Rough-in | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | PART |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Test pass on all roof drains.
|
Plumbing Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 | P | PART |
Eric Strole
|
|
|
BRIAN H. IS JOB CONTACT. ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Center section of roof drains pass.
|
Plumbing Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Eric Strole
|
|
|
BRIAN H. IS JOB CONTACT. ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-2 roof drains and overflows west side test pass.
|
PLM-Aging Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | | PASS |
Bill VanDegrift
|
|
|
still working
|
Groundwork | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER exterior rain drains ok to cover
|
Groundwork | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Jim Johnson
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER groundwork for sanitary and storm drains test ok still need to install groundwork for grease line
|