Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Other | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | DONE |
Eric Strole
|
|
|
Correction notice stays the same.
|
Other | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | CANC |
Eric Strole
|
|
|
|
Final | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | DONE |
Eric Strole
|
|
|
Left correction notice with plumber.
|
Final | 9/30/2015 | 10/1/2015 | 10/1/2015 | P | PART |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to install an avb on hand held at tub & need to install an rpba on dishwashers.
|
PLM-Aging Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 | | PART |
Eric Strole
|
|
|
wip
|
Other | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | DONE |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-This was to leave a correction notice that the spray hose for the bed pan washers need to be isolated with a rpba.
|
Plumbing Rough-in | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/2/2015 | 4/3/2015 | 4/3/2015 | P | PART |
Eric Strole
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Test on section of water pass.
|
Plumbing Rough-in | 3/31/2015 | 4/1/2015 | 4/1/2015 | P | PART |
Eric Strole
|
|
|
BRIAN IS THE JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Water east & west side test pass. Missing nailplates, remove sheetrock and recall for inspection. Do not cover again till inspections are complete.
|
Plumbing Rough-in | 1/13/2015 | 1/14/2015 | 1/14/2015 | P | PART |
Bill VanDegrift
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER dwv test east side bathrooms and salon
|
Plumbing Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PART |
Daryl Spivey
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER J1 and J2 sanitary waste and vent tested ok..............needs nail plates..........ds
|
Plumbing Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT IS BRIAN Phone #: ###-#### Inspection requested via web by ADAM WARR the second three roof drain and overflows test ok
|
Plumbing Rough-in | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | PART |
Eric Strole
|
|
|
JOB CONTACT IS BRIAN HUFFMAN Phone #: ###-#### Inspection requested via web by ADAM WARR-3 roof drains and overflows test pass.
|
Groundwork | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER exterior rain drains ok to cover
|
Water and/or Sewer | 7/17/2014 | 7/17/2014 | 7/17/2014 | A | PART |
Eric Strole
|
|
|
waterline stub outside of building pass
|
Groundwork | 7/11/2014 | 7/14/2014 | 7/14/2014 | A | PASS |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PASS |
Eric Strole
|
|
|
JOB CONTACT - BRIAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Eric Strole
|
|
|
corrections complete. 1st half of g/w pass
|
Groundwork | 7/1/2014 | 7/2/2014 | 7/2/2014 | P | PART |
Eric Strole
|
|
|
CONTACT IS BRIAN HUFFMAN ###-#### Phone #: ###-#### Inspection requested via web by LENNIE BUSS-Need full size cleanouts on 4" p-traps and need to use a fixture fitting foe back to back toilet and mop sink. OK to cover the rest of completed section of ground work.
|