Final | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Daryl Spivey
|
|
|
Travis-needs AM if possible Phone #: ###-####
|
Water and/or Sewer | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | CANC |
Daryl Spivey
|
|
|
The rest of the DWV is complete. If you call and let me know when you will be on site I will send a plumber over there to show you the work on the 7th floor. I will need a hour notice in order to get someone over there. Thanks Phone #: ###-#### Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Daryl Spivey
|
|
|
The rest of the DWV is complete. If you call and let me know when you will be on site I will send a plumber over there to show you the work on the 7th floor. I will need a hour notice in order to get someone over there. Thanks Phone #: ###-#### Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 9/23/2014 | 9/23/2014 | 9/23/2014 | A | NR |
Bill VanDegrift
|
|
|
Just the water lines are on test Phone #: ###-#### Inspection requested via web by Travis Baker set up a ri for pm
|
Plumbing Rough-in | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PART |
Daryl Spivey
|
|
|
System will be ready for inspection around 11:00. Call Travis at ###-#### for elevator access. Phone #: ###-#### Inspection requested via web by Travis Baker ok to cover walls.............ds
|