Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberPLM14-02157
StatusFinaled
Name DEBEST PLUMBING INC
Site Address 1124 S ROOSEVELT ST
Project NameRed Rock Church Addition/Remod
Customer Number14-57
ePlanReviewNo
Description
Plumbing Permit - Alteration: grease interceptor, install/replace fixtures, water service
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/6/201411/10/201411/10/2014APASS
DetailsEric Strole
if questions call Ben @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
Final11/5/201411/6/201411/6/2014APART
DetailsJim Johnson
if questions call Ben @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann need premius protection double check tested and certified prior to final called contractor will recall when ready
Roof Drains11/4/201411/5/201411/5/2014APASS
DetailsBill VanDegrift
roof drain Rough In. if questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann roof drain and overflow ok to cover
Plumbing Rough-in10/14/201410/14/201410/14/2014PFAIL
DetailsEric Strole
Roof Drain RI, Grease Vent RI, if questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-Test on primary roof drains pass. Need secondary roof drains. Test on interceptor vent pass.
Plumbing Rough-in9/9/20149/10/20149/10/2014APART
DetailsBill VanDegrift
ADA Water Closet. if questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann hc wc ri ok
Plumbing Rough-in9/8/20149/9/20149/9/2014APART
DetailsEric Strole
Partial RI, Drinking fountain re rough, recirc mens restroom ceiling, mixing station. If questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-sections in notes pass
Water and/or Sewer8/7/20148/8/20148/8/2014APASS
DetailsBill VanDegrift
First stop Bill interceptor test ok ok to cover
Groundwork8/6/20148/7/20148/7/2014PPART
DetailsEric Strole
U/G ; Interceptor. if questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-@-2-toilets in g/w pass, all piping at interceptor pass, start 24 hr test on interceptor.
Groundwork8/6/20148/7/20148/6/2014PCANC
DetailsEric Strole
U/G. if questions call Ben @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Groundwork8/6/20148/7/20148/6/2014ACANC
DetailsEric Strole
U/G & Interceptor. if questions call Ben @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Groundwork8/5/20148/6/20148/6/2014APART
DetailsEric Strole
U/G Water Main Stub. If questions please call Ben @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-waterline to out side building pass. still need outside connection of waterline.