Water and/or Sewer | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Eric Strole
|
|
|
Final inspection request- backflow devices have been certified by Palmer and domestic water system is approved/finalled by United Water. Please contact John Lauer @ ###-#### if a representative of Brown Construction Inc. is required to be onsite during inspection. thank you. Phone #: ###-#### Inspection requested via web by John Lauer
|
DOC - Permit Finaled | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Eric Strole
|
|
|
|
Other | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 9/11/2014 | 9/12/2014 | 9/12/2014 | P | PART |
Eric Strole
|
|
|
Please contact Bruce Lee- onsite foreman with any questions or concerns. Phone #: ###-#### Inspection requested via web by John Lauer-ok to cover, both rpba's need tested.
|
Water and/or Sewer | 9/4/2014 | 9/5/2014 | 9/5/2014 | A | NR |
Eric Strole
|
|
|
ANY QUESTIONS PLEASE CONTACT ONSITE FOREMAN- BRUCE LEE- 899.0456 Phone #: ###-#### Inspection requested via web by John Lauer-Need to test all piping and rpba's need tested and certified.
|