Final | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Daryl Spivey
|
|
|
All plumbing is ready for final inspection. Trades are still on job so access door should be open, if not lock box code is 5234. Thank you! Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | CANC |
Daryl Spivey
|
|
|
Bathroom trim is complete. Ready for inspection. Lock box code on site is 5234 if no one is home. Thank you. Phone #: ###-#### Inspection requested via web by Scott Sparrell wrong inspection called in..........ds
|
Plumbing Rough-in | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | PASS |
Daryl Spivey
|
|
|
Rough in inspection for new home. Under test and ready. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Groundwork | 9/23/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Daryl Spivey
|
|
|
Groundwork for basement bathroom waste/vent with ejector pump vault. It is under test now and ready. Thanks. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|