Final | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Eric Strole
|
|
|
|
Storm Drains | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PART |
Eric Strole
|
|
|
Underground, around 2:30 - Jose Phone #: ###-####-Need to test
|
Groundwork | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | NR |
Eric Strole
|
|
|
Jose Phone #: ###-####-Not ready
|
Storm Drains | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | FAIL |
Eric Strole
|
|
|
Camera work not working very well at this time.
|
Plumbing Rough-in | 4/15/2015 | 4/17/2015 | 4/16/2015 | A | CANC |
Eric Strole
|
|
|
underground storm drain - Jose Phone #: ###-####
|
Storm Drains | 4/15/2015 | 4/15/2015 | 4/16/2015 | P | PART |
Eric Strole
|
|
|
Test is good and cover is good.Camera of the storm drains will be done this Friday mourning. Need to resummit drawings for stormdrains by final being they are not per the approved plans.(NONE OF THE PIPE INSTALLED UNDER THE BUILDING FOR THE STORM DRAIN SYSTEM IS APPROVED MATERIAL PER THE 2009 ISPC.)
|
Groundwork | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | FAIL |
Eric Strole
|
|
|
Jose Phone #: ###-####-Need to test all piping
|
Groundwork | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | NR |
Eric Strole
|
|
|
Jose-testing of water Phone #: ###-####-not ready
|
Other | 2/13/2015 | 2/13/2015 | 2/13/2015 | A | PART |
Eric Strole
|
|
|
See Bills notes
|
Other | 2/13/2015 | 2/13/2015 | 2/13/2015 | A | PART |
Bill VanDegrift
|
|
|
met with contractor and civil engineer about the parking garage and rood drainage inside the building being installed in the wrong material and being covered without inspection or teting.
|
Water and/or Sewer | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | CANC |
Eric Strole
|
|
|
Jose Phone #: ###-####-No inspection required for down spouts.
|