Final | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy temp occ ok
|
Final | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy remove roofing membrane from roof drain bodies
|
Final | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PART |
Eric Strole
|
|
|
Need final for A;B wings. Phone #: ###-#### Inspection requested via web by Brent Lacy2nd flr A-B wing except 201 & 206 final ok. Need dishwashers set in 201 & 206 for final and roof drains still need roofing material cut out.
|
Final | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | FAIL |
Eric Strole
|
|
|
B wing 3rd floor final Phone #: ###-#### Inspection requested via web by Brent Lacy-3rd & 4th flr units final ok. Need to cut roofing material out of roof drains.
|
Plumbing Rough-in | 2/10/2015 | 2/10/2015 | 2/10/2015 | P | PART |
Eric Strole
|
|
|
Water Mains Phone #: ###-#### Inspection requested via web by Brent Lacy-A & B wing mains in corridors pass
|
Plumbing Rough-in | 12/10/2014 | 12/10/2014 | 12/10/2014 | P | PART |
Eric Strole
|
|
|
A-wing r/i pass
|
Plumbing Rough-in | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Not ready
|
Plumbing Rough-in | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Eric Strole
|
|
|
A-wing 1st flr rough-in pass. A-wing 2nd flr ok to cover ceiling.
|
Plumbing Rough-in | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PART |
Eric Strole
|
|
|
1st & 2nd flr B-wing rough-in pass
|
Plumbing Rough-in | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | FAIL |
Eric Strole
|
|
|
A & B wing-uncover all plumbing for inspection.
|
Plumbing Rough-in | 10/27/2014 | 10/27/2014 | 10/27/2014 | A | FAIL |
Eric Strole
|
|
|
Need to fix backgrade on section of DWV in garage overhead for B-wing.
|
Plumbing Rough-in | 10/27/2014 | 10/27/2014 | 10/27/2014 | A | PART |
Eric Strole
|
|
|
A-wing roof drains pass. B-wing roof drains pass. B-wing 3rd & 4th flr rough-in pass. (FOR ALL OTHER NOTES SEE PLM14-00141)
|