Final | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Plumbing Rough-in | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Test on mains E-wing pass
|
Final | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | NR |
Eric Strole
|
|
|
Temp Final Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy temp occ ok
|
Final | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy remove roofing membrane from roof drain bodies
|
Final | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-C-wing units final ok.
|
Final | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | FAIL |
Eric Strole
|
|
|
C wing 3rd and 4th floor final. Phone #: ###-#### Inspection requested via web by Brent Lacy-3rd flr units final ok. Need to cut roofing material out of all roof drains.
|
Plumbing Rough-in | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PART |
Eric Strole
|
|
|
1ST flr E wing manafolds pass.ok to cover.
|
Plumbing Rough-in | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | NR |
Eric Strole
|
|
|
Water Rough-In Phone #: ###-#### Inspection requested via web by Brent Lacy-not ready
|
Plumbing Rough-in | 2/10/2015 | 2/10/2015 | 2/10/2015 | P | PART |
Eric Strole
|
|
|
Water Mains Phone #: ###-#### Inspection requested via web by Brent Lacy-Mains in corridors pass and ok to cover 2nd flr E-wing.
|
Plumbing Rough-in | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PART |
Bill VanDegrift
|
|
|
This inspection is for D Wing Second Floor Water. Phone #: ###-#### Inspection requested via web by Brent Lacy 2nd floor d- wing ok to cover
|
Plumbing Rough-in | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Water in units of 3rd flr e-wing pass
|
Plumbing Rough-in | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-petra covered water lines with sheetrock on 3rd flr E-wing,cannt see all waterlines.
|
Other | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 1/8/2015 | 1/8/2015 | 1/9/2015 | P | CANC |
Eric Strole
|
|
|
water piping inspection. Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Plumbing Rough-in | 12/15/2014 | 12/16/2014 | 12/16/2014 | P | PART |
Eric Strole
|
|
|
E-wing DWV complete
|
Plumbing Rough-in | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | PART |
Eric Strole
|
|
|
DWV in E wing Phone #: ###-#### Inspection requested via web by Brent Lacy-E-wing units 101 thru 301, 103 thru 303 & 105 thru 305 DWV pass. E-wing DWV in mechanical room pass.
|
Roof Drains | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-E-wing roof drains pass
|
Roof Drains | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PART |
Eric Strole
|
|
|
Roof drains D-wing pass.
|
Plumbing Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Eric Strole
|
|
|
D-wing 2nd flr dwv pass.
|
Plumbing Rough-in | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PART |
Eric Strole
|
|
|
1st & 2nd flr C-wing rough-in pass
|
Plumbing Rough-in | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | FAIL |
Eric Strole
|
|
|
C,D & E wing-uncover all plumbing for inspection.
|
Plumbing Rough-in | 10/27/2014 | 10/27/2014 | 10/27/2014 | A | PART |
Eric Strole
|
|
|
C-wing roof drains pass. 1st, 2nd & 3rd flr rough-in pass. For all other notes see plm14-00141.
|