Final | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 9/29/2015 | 9/29/2015 | 9/30/2015 | P | PART |
Eric Strole
|
|
|
Kitchen Final Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to put ice tea, juice on there own rpba. coffee and capicino can be on the same rpba. Need to install rpba's on soap dispensors or change out to one's with an air gap. Need to run seperate waterline to soap dispensor at mop sink.
|
PLM-Aging Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | | PART |
Eric Strole
|
|
|
wip
|
Final | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy temp occ ok
|
Final | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy remove roofing membrane from roof drain bodies
|
Final | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | DONE |
Eric Strole
|
|
|
This was a walk-thru in the kitchen area.
|
Final | 5/14/2015 | 5/15/2015 | 5/14/2015 | A | CANC |
Eric Strole
|
|
|
Partial Final inspection for the Commercial Kitchen area only. Phone #: ###-#### Inspection requested via web by Brent Lacy Inspection cancelled from web by: Brent Lacy
|
Plumbing Rough-in | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PART |
Eric Strole
|
|
|
Water piping kitchen Phone #: ###-#### Inspection requested via web by Brent Lacy-corrections complete
|
Plumbing Rough-in | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | FAIL |
Eric Strole
|
|
|
Ready for inspection right now in am for water mains in H. Thank you, Robert Phone #: ###-#### Inspection requested via web by Brent Lacy-1" and less for cpvc needs to be supported every 36". Test ok. This is for the kitchen overhead water.
|
Plumbing Rough-in | 2/9/2015 | 2/10/2015 | 2/10/2015 | A | PART |
Eric Strole
|
|
|
Water Mains in Area D Commons ; Dining Phone #: ###-#### Inspection requested via web by Brent Lacy-Water mains in corridor pass
|
Plumbing Rough-in | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | PART |
Eric Strole
|
|
|
Dwv complete
|
Plumbing Rough-in | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Plumbing Rough-in | 1/9/2015 | 1/9/2015 | 1/9/2015 | A | PART |
Eric Strole
|
|
|
All water in walls for public baths and hosebib and 2 breakroom sinks and all dwv test pass.
|
Roof Drains | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy rain drains in kitchen test ok ok to cover kitchen ceiling
|
Roof Drains | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Roof drains in dinning and host area pass
|
Plumbing Rough-in | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-DWV for dinning and host area pass.
|
Plumbing Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PART |
Eric Strole
|
|
|
Dwv 1st & 2nd flr pass.
|
Roof Drains | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Eric Strole
|
|
|
D-wing common 1st flr dwv and vents and in basement for d-wing bath only pass.
|