Final | 1/8/2016 | 1/11/2016 | 1/11/2016 | A | PASS |
Eric Strole
|
|
|
|
Final | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PART |
Eric Strole
|
|
|
Will final when stand alone permit is issued for kitchens.
|
Final | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Eric Strole
|
|
|
Final on H-Wing Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to isolate pedicure chair with rpba,s. Need to set all fixtures. Need all kitchen equipment installed. Temp final ok.
|
PLM-Aging Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PART |
Eric Strole
|
|
|
wip
|
Other | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | DONE |
Eric Strole
|
|
|
Need to look at overflow drains. Phone #: ###-#### Inspection requested via web by Brent Lacy-This was a conferance on overflow drains.
|
Plumbing Rough-in | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-H rough-in pass
|
Plumbing Rough-in | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-2nd flr rough-in complete except water in pantry.
|
Plumbing Rough-in | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | PART |
Eric Strole
|
|
|
Need inspection today if possible.
Thank you - Robert Phone #: ###-#### Inspection requested via web by Brent Lacy-H-wing commons water pass
|
Plumbing Rough-in | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PART |
Eric Strole
|
|
|
dwv test h-wing pass
|
Plumbing Rough-in | 5/1/2015 | 5/1/2015 | 5/1/2015 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-2nd flf H wing mains test pass
|
Plumbing Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-1st flr H-wing r/i complete.Test on dwv 2nd & 3rd flr assisted living H-wing pass.
|
Plumbing Rough-in | 4/20/2015 | 4/21/2015 | 4/21/2015 | P | PART |
Eric Strole
|
|
|
Units 109 thru 120 test on waster pass and ok to rock shower area so they can install showers.
|
Plumbing Rough-in | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Test on DWV in units 108 thru 115, 205 thru 210, 305 thru 310 pass.
|
Final | 4/20/2015 | 4/21/2015 | 4/20/2015 | A | CANC |
Eric Strole
|
|
|
|
Roof Drains | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-Test on roof drain complete. Missing some hangers
|
Water and/or Sewer | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PART |
Eric Strole
|
|
|
Test on interceptor pass along with all underground piping.
|
Groundwork | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PART |
Eric Strole
|
|
|
Start of 24 hr test on interceptor
|
Groundwork | 3/27/2015 | 3/27/2015 | 3/27/2015 | A | CANC |
Eric Strole
|
|
|
|
Groundwork | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | CANC |
Eric Strole
|
|
|
Grease Trap and Grease line to grease trap Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Plumbing Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PART |
Eric Strole
|
|
|
Would like to schedule this inspection for Thursday afternoon. Phone #: ###-#### Inspection requested via web by Brent Lacy-HL wing ok to cover walls.H patio area drains pass.HL roof drains pass.
|
Plumbing Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Eric Strole
|
|
|
DWV inspection Phone #: ###-#### Inspection requested via web by Brent Lacy-OK to cover lid public rest rooms 2nd flr H wing. H lower 1st flr DWV pass.
|