Final | 8/25/2015 | 8/26/2015 | 8/25/2015 | A | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | | | 8/25/2015 | | DONE |
Christina Prado
|
|
|
|
Final | 8/11/2015 | 8/11/2015 | 8/11/2015 | P | PART |
Eric Strole
|
|
|
|
Final | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PART |
Eric Strole
|
|
|
JEFF IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to label hosebibs in hanger bay non potable do not drink.
|
Plumbing Rough-in | 6/17/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Eric Strole
|
|
|
JOB CONTACT - JEFF ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PART |
Eric Strole
|
|
|
JEFF IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Vents off interceptor and lift station pass
|
Groundwork | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PART |
Eric Strole
|
|
|
Marc H. is job contact. ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Spoke with Bill Vandegrift about my concerns of the drains going into the fuel interceptor not having any traps or vents required by the 2009 ISPC. I was told by Bill Vandegrift that they are not required.Under ground drains into fuel interceptor ok to cover.
|
Groundwork | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PART |
Eric Strole
|
|
|
MARC H. IS THE JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Test on 2 sections of 4" drains to trench drains pass
|
Groundwork | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | FAIL |
Eric Strole
|
|
|
MARC H IS JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Not ready
|
Other | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | CANC |
Bill VanDegrift
|
|
|
2pm
|
Other | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | PART |
Bill VanDegrift
|
|
|
2pm will put one RP on the discharge side of the hot and cold hose bibs in the hanger. perm. connection to hose threads
|
Groundwork | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PART |
Bill VanDegrift
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER main line and branches to trench drains test ok.
|
Other | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | DONE |
Eric Strole
|
|
|
left correction notice
|
Plumbing Rough-in | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PART |
Eric Strole
|
|
|
JOB CONTACT - MARC ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Office area DWV and water test pass. Ok to cover walls. Need to isolate hot/cold hosebibs with a rpba.
|
Groundwork | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PASS |
Eric Strole
|
|
|
Test on interceptor pass
|
Groundwork | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PART |
Eric Strole
|
|
|
MARC H IS JOB CONTACT, ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Start of 24 hr test on interceptor
|
Groundwork | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Eric Strole
|
|
|
MARC H IS JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-ok to cover lift station up to vent connection.
|
Groundwork | 1/13/2015 | 1/14/2015 | 1/14/2015 | A | PART |
Jim Johnson
|
|
|
JOB CONTACT - MARC ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER water line stub in to building test ok ok to cover
|
Groundwork | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PART |
Eric Strole
|
|
|
JOB CONTACT - MARC ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Sanitary pass.
|