Final | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Eric Strole
|
|
|
Call for access Phone #: ###-#### Inspection requested via web by Ben Decker
|
Final | 4/1/2015 | 4/2/2015 | 4/2/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker 1) permit all new fixtures 2) ont trap per waste arm
|
Final | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PEND |
Eric Strole
|
|
|
Call for access. Phone #: ###-#### Inspection requested via web by Ben Decker-No access and need permit fot pvb on sprinkler system.
|
Plumbing Rough-in | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker
|
Plumbing Rough-in | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker-ground work pass
|