Water and/or Sewer | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Eric Strole
|
|
|
Final inspection. Site contact is JT Waters ###-#### Phone #: ###-#### Inspection requested via web by Brian Schneider
|
DOC - Permit Finaled | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Eric Strole
|
|
|
|
Final | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Eric Strole
|
|
|
Final inspection for plumbing and verification of RP installation. Site foreman is JT Waters Phone #: ###-#### Inspection requested via web by Brian Schneider-Temp rp ok, will install stainless rp in 3 to 4 weeks. Temp final ok
|
Plumbing Rough-in | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PART |
Bill VanDegrift
|
|
|
Plumbing contact is JT Waters Phone #: ###-#### Inspection requested via web by Brian Schneider needs an RP on the cooler tempered water feed.
|