Final | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Bill VanDegrift
|
|
|
|
Water and/or Sewer | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Bill VanDegrift
|
|
|
Please call Scott for access. 15 min prior. Will meet on site. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | NH |
Bill VanDegrift
|
|
|
Final Plumbing inspection top floor bathroom. Phone #: ###-#### Inspection requested via web by Scott Sparrell no access called contractor
|
Plumbing Rough-in | 2/27/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Daryl Spivey
|
|
|
Top out rough in plumbing for bathroom upstairs. Under test and ready this am. Phone #: ###-#### Inspection requested via web by Scott Sparrell indirect waste needs to be visible......ds
|
Plumbing Rough-in | 2/27/2015 | 2/27/2015 | 2/27/2015 | A | CANC |
Daryl Spivey
|
|
|
Top out rough in plumbing for bathroom upstairs. Under test and ready this am. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 1/22/2015 | 1/23/2015 | 1/23/2015 | A | PART |
Daryl Spivey
|
|
|
Putting rough in plumbing in floor under test. Reg will be ready early AM. Phone #: ###-#### Inspection requested via web by Scott Sparrell ok to cover floor.......ds
|