Final | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PASS |
Daryl Spivey
|
|
|
MARK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | PART |
Daryl Spivey
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER hot water not on and need tempering device on lavs.........ds
|
Groundwork | 11/9/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Daryl Spivey
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Water and/or Sewer | 11/9/2015 | 11/10/2015 | 11/9/2015 | P | CANC |
Daryl Spivey
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Final | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PART |
Daryl Spivey
|
|
|
3RD FLOOR FINAL. THE JOB CONTACT IS JAMES ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor done........ok for occ...........ds
|
Plumbing Rough-in | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PART |
Bill VanDegrift
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 4th floor bar sink ri ok. plan calls for a 2" pump drain, installed 1 1/2" grgravity drain. 2 fu allowed in accordance with ISPC. vent runs north 12 feet to tie in to existing.
|
Plumbing Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PASS |
Daryl Spivey
|
|
|
KIETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor breakroom ok..........ds
|
Final | 6/29/2015 | 6/30/2015 | 6/30/2015 | P | PART |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2nd floor and basement completed........ds
|
Plumbing Rough-in | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PASS |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2nd floor rough ok to cover........ds
|
Plumbing Rough-in | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | PASS |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | CANC |
Daryl Spivey
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER james cancelled by phone......ds
|
Groundwork | 2/16/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Daryl Spivey
|
|
|
JAMES M. IS JOB CONTACT. ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|