Final | 3/20/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Eric Strole
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | DONE |
Eric Strole
|
|
|
JOB CONTACT IS AB ###-#### Phone #: ###-#### Inspection requested via web by MARGGIE BUSS-This was a conferance on the backflows required.
|
Final | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PART |
Eric Strole
|
|
|
DAVID IS JOB CONTACT, ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to install a DBCA on water supply and need to install a RPBA on water supply feeding car wash.
|
Plumbing Rough-in | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Eric Strole
|
|
|
8:00 am
|
Plumbing Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | CANC |
Eric Strole
|
|
|
DAVID IS JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Eric Strole
|
|
|
DAVID IS JOB CONTACT. ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 2/17/2015 | 2/18/2015 | 2/19/2015 | A | FAIL |
Eric Strole
|
|
|
DAVID IS JOB CONTACT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need approved plans on site for inspection. Ok to cover as long as it is per plans.
|