Final | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Rena Scott
|
Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | DONE |
Eric Strole
|
|
|
as per Rod parts are not in yet so needs to cancel
|
Final | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PART |
Eric Strole
|
|
|
Close to 4 would be appreciated. Thank you. Phone #: ###-#### Inspection requested via web by Rena Scott-Temp final ok.Need all backflows tested, caulk all sinks,install soap dispensors and filter system.
|
Other | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PART |
Eric Strole
|
|
|
This was a conferance on backflows required.
|
Other | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | NR |
Eric Strole
|
|
|
Job Walk. 8 am. Thank you Phone #: ###-#### Inspection requested via web by Rena Scott
|
Other | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | DONE |
Eric Strole
|
|
|
This was to put a sticker on gas line.
|
Plumbing Rough-in | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Eric Strole
|
|
|
Gas Piping. Will be ready at 2pm Phone #: ###-#### Inspection requested via web by Rena Scott-20 lb gas test pass
|
Plumbing Rough-in | 3/3/2015 | 3/4/2015 | 3/4/2015 | P | PART |
Eric Strole
|
|
|
Gas Piping Inspection. Early PM is okay. Test will be on late AM. Phone #: ###-#### Inspection requested via web by Rena Scott-20 lb gas test from meter to stub up to roof pass.
|
Plumbing Rough-in | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 3/2/2015 | 3/3/2015 | 3/3/2015 | P | PASS |
Eric Strole
|
|
|
Jeremy is the plumber on site. Phone #: ###-#### Inspection requested via web by Rena Scott
|