Final | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Jim Johnson
|
|
|
|
Final | 5/7/2015 | 5/7/2015 | 5/7/2015 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Raul Castanon need RP installed prior to water filter as per city approved plan ok temp contractor to recall when ready
|
Final | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PART |
Bill VanDegrift
|
|
|
Inspection requested via web by Raul Castanon just had me out to look at the ice mechane in bace. it needs an rp on the water cooled compressor and a dcva on the water to ice because of an enclosed airgap.
|
Water and/or Sewer | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | CANC |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Raul Castanon canc by Raul
|
Plumbing Rough-in | 3/22/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Raul Castanon
|
Groundwork | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PASS |
Jim Johnson
|
|
|
late morning if possible, thanks Jim Phone #: ###-#### >> Inspection requested via web by Raul Castanon
|