Final | 4/20/2015 | 4/21/2015 | 4/20/2015 | A | PASS |
Jim Johnson
|
|
|
Chris Phone #: ###-####
|
Sprinkler (Final) | 3/20/2015 | 3/30/2015 | 3/30/2015 | A | PART |
Jim Johnson
|
|
|
check the blowout tee has been mover downstream of the dcva and that the dcva has been tested. ok to cover the tie in. need to have double check tested and certified for final contractor to recall when ready
|
Sprinkler (Final) | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | CANC |
Bill VanDegrift
|
|
|
Chris Phone #: ###-#### wrong permit rescheduled for a final on the 30th
|
Water and/or Sewer | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | NR |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by chris wickam not ready called contractor left message to recall when ready
|